Home ยป Construction Page 2

Construction Page 2

With the roof sheathing
Window set came in 5 pieces; frame had to be built on site.
Very complex roof line for chalet-style. All cut by hand.
We decided we really needed a pergola.  It looked too much like the suburbs to me.
Erecting the porches
New Pergola. Note how rain is directed onto deck from roof. Oops!
We had to run a gutter along the pergola to redirect it.
Application of Log Siding second floor
Note the settling space left above all the doors and windows
Great Room ceiling before the tongue-and-groove is applied, with 12″ of insulation.
The mud coat before the stucco
Front Porch
Stucco and stonework added to chimney

Page: 1 and 3